Hi, I am instaled AlmaLinux 8.4 and i updated my kernel. The default kernel is 4.18.0-305.el8.x86_64 And after update to version 4.18.0-348.12.2.el8_5.x86_64 .
Now, the first order boot is 4.18.0-348 and this kernel do not have the driver my Perc SCSI Controler. And my system don´t start.
I need to set the keyboard to second choice the Local Machine to My System Started.
How to return kernel 4.18.0-305.el8.x86_64 to first option ? Where i found this configuration into the Grub ?
Hi, My server is Dell R410 and this Hardware have one controller and driver this controller was moved for the new version Centos8, AlmaLinux, RockLinux. Look Bellow what i do to install AlmaLinux into the Dell R410.